Since April 2002
Company : MECON LTD
Place :Ranchi
Manager
Current Assignments :-
q
Detail
Engineering of COKE Oven Battery of Vizag Steel Plant .
q
Design
of Stock House Bunkers & Slag Granulated Plant 60M high Steel chimney
for M/S Jindal's (JVSL) new
1250 M3 Blast Furnace Complex at Belari.
q
Detail
Project Report for Structural work for Uranium Corporation India Limited
new mines facilities at Lambapur (AP) & Bandhurang mines (Jharkhand)
q
Detail
Project Report & Consultancy Services for Structural work for
Augmentation of Water Supply Facilities at Dumka, Jharkhand.
q
Preparation
of Offer, preliminary Design of Football Stadium & Indoor Stadiums for
Hazaribagh Mega City project
of Jharkhand Govt.
q
Development
of Software for Analysis, Design & Detail drawings of
Crane Girders.
q
Development
of An Online Drawing Management System for Campus Network & for MECON
Limited web site.
Project Completed
in (2001-2002)
q
IOCL-Tank
Terminal at Amousi Preparation
of TS, Getting the design
calculations and design drawings for various units approved by the
consultant (M/s PDIL, NOIDA). In this project,
STAAD design facility has been used for steel structures.
q
Design
of various units of
BOF Complex of Phase-II of
Neelachal Ispat Neegam Limited at Duburi, Orissa.
q
Structural
Modelling of Various units of Vacuum Distillation Units ( VDU ) / Heat
Exchanger Building for Haldia Petrochemicals using framework Plus with
Microstation under PDS (Plant Design System).
q
Business
Development and study of scope of Cable Stay Bridges in the state of
Jharkhand.
1997April 2002
Company : MECON LTD
Place :Ranchi
Senior Design Engineer
-
Consultancy
Projects : -
Preparation of TS, evaluation of offers, detail engineering, approval
of fabrication drawings and site visit for the following projects.
- Stock House and Inter Plant Pipelines of M/s Neelachal Ispat Nigam Limited at Dubri. (The bunkers of
stock house and pipelines trestles were designed by self developed
software. )
- Coke Oven Battery and
Coal Handling Plant of M/s
Konark Met Coke Ltd at Dubri.
- Rehabilitation Scheme for Synthetic
Rutile Plant at IRE-OSCOM, Chatrapur. ( The plant was visited and
assessed the condition of structures was assessed, and based on the
observations and site reading, the detail stiffening/replacement
schemes of different component of structures were prepared.)
Turnkey
Projects: -
In
following
turnkey project the assessment of scope of work was done after site visit.
The work also included preparation of offer, Preparation of TS, detail
engineering, getting consultant's approval of design calculations and
design drawings, preparation of fabrication drawings and site supervision).
·
Pipe Lines Structures
for Improvement of Tailing Disposal System at Kiriburu Iron Ore Mines (India) for
SAIL.
·
Site supervision at
NCTPS-TNEB Chennai for External
Coal Handling System. : Seven Months posting at TNEB site :
I
was assigned the task of supervision of erection and fabrication work
under the scope of our sub contractor M/s Fenner, who was lagging at all
fronts. I brought the turn around in their performance by convincing
Fenner's Project Manager that they would not be in red if they complete
the job in given time frame. And the priority route was commissioned
timely.
19891997
Company :MECON LTD
Place : Ranchi
Design Engineer/Assistant Design Engineer
·
Detail Project
Engineering which included preparation of TS, design of structures,
preparation of design drawings, approval of fabrication drawings and
Designer's supervision at site for Rolling, Melting and Casting Complex
& different Store buildings of India Govt. New Mint at Hyderabad,
India, for Rolling Mill, Steel Melting Shop and Complete Material Handling
System of Llyods Integrated Steel Plant at Wardha, Maharashtra, India, for
Complete units of Mill for Jindal Seamless Tube Plant at Nasik, India.
·
Development of
software for Design of Rectangular Steel Bunkers.
19891990
Company :MECON LTD
Place : Ranchi
Management
Trainee
·
Study of different units of Steel Plants at site offices and
their design criteria at Bokaro Steel Plant, Salem Steel Plant, Vizag
Steel Plant
My Other
Achievements: -
·
I presented a paper on "Study of Condition of
Structures at IRE-Chatrapur - Cause and Remedy" at 6th National
Congress on Corrosion at Calcutta in 1995 based on the report, which I
prepared for QIT/Hatch associates for their techno-economics analysis of
the above plant.
·
Development of Software for Design of Pipelines Supporting
Structures & Box Crane Girder in MS-Office-EXCEL.
·
Development of Software for Calculation of Load for Design
of Civil Foundation for Conveyor Galleries in MS-Office-EXCEL.
Development of Software in dBaseIV for Status of
Approval of Fabrication Drawings |