This
being largely a mountain railroad, I've gotten a lot of practice casting
rocks and building trees!
The scenery base is either hardshell or styrofoam overlaid with plaster
or Sculptamold. Rock faces are cast in place using molds made of crumpled foil
(I highly recommend this technique!).
I hand-paint
the backdrops, using photographs of the real locations as a guide.
This photo shows part of the ski area on Vasquez Ridge. The shadows of the
trees give real depth to the scene. By the way, I'd never painted anything in my life before
doing these backdrops, so don't let inexperience stop you.
Currently I'm working on painting some 20,000 spruce trees in the Winter Park area...
 Here's
a look at the unfinished grain elevator at North Yard, owned by Cargill.
There are a couple of tracks that service the elevator. As you can see,
scenery is not finished yet in this area. Still to come: the loading bay
and machinery for the elevator (towards the far end of this photo), plus a
number of other details, and of course, painting. This elevator is by far
the largest structure on the layout.
A dominant scene is the Big 10 Loops section. This
area is basically the edge of the High Plains, so is transitional from
grasslands to a mountain environment. I still have a few finishing touches to
complete (mostly, snowbanks in the shady spots). I built the hopper car
windbreak by sacrificing some old McKean triple hoppers that I had on hand,
spray-painting them tan. The real location has 23 cars-- I have six--
giving you an idea of how much compression is required when model railroading in
a garage... This scene forms a large peninsula in the center of the
layout.

A look at the Big 10 area, as a loaded coal train drifts downgrade
through Clay siding. Note the windbreak cars in the foreground.
That's a temporary digital backdrop of the real area.
And here's the actual backdrop, just completed as of May 2008. In this
shot, a pair of SD45T-2's and a Rio Grande SD40T-2 are heading past Clay siding
along the base of the Front Range. I try to blend the foreground scenery
and backdrops as carefully as I can, and with the right camera angle it looks
fairly convincing. The rock outcroppings are the Ralston Buttes,
essentially the southernmost of the rock formations known as the Flatirons which
occur between here and Boulder.
Another look in the same
general area, with train 101 headed upgrade at Clay. The foreground
scenery is the open ground in the middle of the Big Ten loop. You can see
here the beginning of the transition between the lower and upper levels of the
layout.
This backdrop is eight feet long, made from Masonite hardboard, and
took me about a week in my spare time to paint. See, it really doesn't
have to be a show-stopping project to create a respectable backdrop. I
made it to be removable, since it backs a peninsula that juts into the room (a.k.a.
garage). One thing I did differently here was to cut the backdrop to
shape along the skyline, or horizon, with the sky on separate foam core board
mounted behind. The sky will be removable as well. This layered approach
should give a nice feeling of depth.
 Here's
the east portal of Tunnel 2. Rockwork is done and foliage is progressing.
Backdrop scenery is painted above and below the track here.
Yup. It's finally happening. I'm actually moving into the UP era.
My first Borg acquisition is SD9043MAC No. 8146, from Kato-- far and away my
most expensive power purchase yet! (the nice thing about model railroading
is, I can always put these guys into the case and get out the Rio Grande power.
The clock spins forwards and backwards around here!)
The Big Ten landscape began with styrofoam sheets,
followed by Sculptamold and plaster for the final landforms. I then
painted it appropriate colors, and spread yellow grass and sawdust for ground
cover.
There is a scenery divider between Plainview and Pinecliffe. The eastern
end is the Tunnel 2 scene, and the western side is the Tunnel 27 scene.
Here's
Tunnel 27, the west portal. Since this photo was taken, I've added trees,
but it still needs some backdrop "adjustments". The new foreground scenery will be blended into the
existing backdrop. This scene is far up South Boulder Canyon, so the
geology is much different than around Tunnel 2.
 Here's
my most recent scenery project, the east portal of tunnel 30. It has
more rockwork castings using the aluminum foil technique, a cast tunnel
interior, and a detailed (and accurate) portal facing. This style shows up
on many tunnels in the Tunnel District.
Most of the trees were created using my technique described below.
Since I'm modeling the area in winter, there's a lot of snow. I pour
plaster in flowing shapes and paint white, sprinkling silver glitter into the
wet paint (just a little). However, the lower reaches of the layout will
be more typically bare, with just a little snow in the shady areas. In the
photo at left, a manifest train is westbound in the late afternoon at
Hideaway Park, an area completely buried in snow. Vasquez Road is visible
in the trees, as is the chapel.
(In these photos,
you can see spruce and fir, plus a few commercial trees. The foreground
scenery wasn't in yet, but since this photo it has been completed-- see below.)
My daughter and I have been busy
manufacturing trees of various species--
spruce, ponderosa, fir-- by cutting up Christmas greenery. You need a
lot of trees to fill a forest in Colorado. At this point I'm estimating
about 200 trees for the Hideaway Park scene alone. This photo shows
the CSUX unit train rolling down the grade near Hideaway Park, with the
partially-filled forest in the background.

There are a lot of aspens in the valley north of West Portal. Since
it's winter, the trees don't have leaves, which I choose to view as a blessing.
In this photo, a grove of aspens crowds against the right-of-way. I make
the aspens from twigs of sagebrush, carefully selecting pieces and stripping off
the bark. I then paint with white acrylic, splatter with dilute black,
then seal with clear spray paint.
Here's
an overview of the West Portal area. The bridge at West Portal has a trestle bent and handrails & supports all made from structural styrene. The tunnel portal was scratch-built from styrene and detailed, and the ski lodges were also scratch-built
from structural styrene, using photographs to assist in design and proportions. I make
free use of selective compression to fit structures into scenes.

A closer look at the tunnel portal. I'm extremely proud of how this turned
out, even though it's not quite finished. One section of chain-link fence
was damaged in the move, and I still need to replace it. Ditto the bridge
handrails. I also need to install the plaques on the two wings of the
portal. Other than that, it's a pretty good representation of the scene
circa 1990.
The
chapel at Hideaway Park is basswood and 3/32" plywood, with sandpaper
shingles. It's free-lanced; my wife and I built it together in about
1983. The far end has a massive stained-glass window. Note the two
Ford Explorers. They were built from clear-styrene kits, and painted to
match real Ford schemes. Even the license plates are hand-painted.

Here's a close-up of a railfan, standing trackside at tunnel 29 with his
two kids running around in the background. (Yeah, this scene actually
happened in November 1994; that's me. In real life I'm not quite as lumpy,
or at least I wasn't back then...)

Here's a section shed,
built to scale from the real one at West Portal. I need to backfill a
little drifting snow around the foundation.
I've been working on
beefing up the foreground scenery. Here a signal shack (modeled after the
real one) sits next to the grade crossing at Vasquez Road. The crossbuck
is also new. Someday I'd like to replace it with a working
flasher-and-gate unit. Signage brings a layout to life.
Current Status:
- Ballast is nearly complete.
- Scenery forms are installed everywhere, including the Tunnel 30 scene..
- Hideaway Park is nearing completion, with trees being manufactured and
installed at present.
- The Tunnel 2 / 27 divider is essentially complete.
- Fascia is nearly complete.
- West Portal is about 4/5 complete. I need to repair some damage that
occurred during the move, plus finishing some details on the lodge.
- The Winter Park siding area is mostly done. The backdrop itself is
largely complete, but a few feet of it still need tree detail.
- The helix (Moffat Tunnel) is now fully enclosed, and I've begun painting
some background scenery on it.
- Pinecliffe (tunnels 27 through 30) is essentially complete.
- Some scenery work has started in the Denver area. The Cargill
grain elevator is mostly complete. This dude is HUGE. Probably too
big for my layout. I've also been spreading dirt and ballast in North
Yard.
Long-range plans include the following:
- Build the yard office for North Yard
- Install floodlights on towers in the yard, and electrify the structures at
Winter Park and Hideaway Park.
Really long-range plans include:
- Extend the track south and construct a Union Station / Joint Line module
- Install a working signaling system
|