|
|
PENDAKIAN KE PUNCAK LEDANG
Aktiviti pertama yang kita orang jalankan iaitu pada
cuti semester mei yang pertama. Ia melibatkan 10 orang
peserta. Aktiviti berjalan selama 3 hari 2 malam dan
setiap kutipan yang diambil ialah sebanyak RM20 untuk
setiap seorang peserta. Bagi melihat lebih detail
tentang aktiviti ini sila layari halaman web kami
iaitu di
http://www.geocities.com/xpdc_ledang. |
|
|
 |
|
Persiapan
Malam sebelum
bertolak kami mengumpul segala peralatan
termasuk bekalan makanan dan dibahagikan sama
banyak. Bekalan makanan segera seperti roti,
beras, sardin, maggi perlu disediakan untuk 3 ke
4 hari perjalanan. |
|
7.00 am sebelum
bertolak
The sundial, 35 metres in diameter uses the changing position of a shadow to indicate the time of the day. A raised pointer, made of concrete pylon in various shapes of figurines, each encrusted with its numbering, is fixed to a horizontal plate at an equal angle of the latitude of the site which is pointing North. The plate is marked off in hourly segments. As the sun passes from East to West, the shadow
cast by each figurine moves through divisions, indicating the hour
of the day.
|
|
|
 |
 |
|
12.00 pm Tiba di
Sagil
Perjalanan dari parit jelutong ke Sagil
memakan masa hampir 4 jam. Kami berolak dari
Parit Jelutong ke Hentian Bas Batu Pahat- Muar
dan menaiki bas ke Sagil Seterusnya kami perlu
berjalan kaki sejauh 2 km untuk ke kawasan kaki
gunung ledang ( Ledang Resort) |
|
Singgah untuk solat
zohor
Approximately about 2-3 metres raised above ground level, the castle mounds are made from various materials such as grass, cobblestones, pre-cast rustic concrete and rocks.
|
|
|
 |
 |
|
Bermalam di tengah
perjalanan
Concrete path will be provided for leisure walk, jogging and cycling. Tram path stretching approximately 2km will be used to shuttle the public from parking area to other place of interest within the park. Along coastline, timber boardwalks of about 500m long interconnect thend. Fishing Jetty protruded 50m into the sea will be constructed. |
|
|
Masak untuk makan
malam
Hard and Soft landscapes are provided over the general areas within the park other than those provided in the public components. Comprising from different materials and plants will enhance the aesthetical view of the park.
|
|
|
 |
 |
|
Sediakan unggun
An oval shape concrete slab of approximately 500 sq. m is designated for performance of roller skating located within the vicinity of Formal Garden . |
|
Warm up sebelum meneruskan perjalanan Single storey structure constructed with structural steel frame resting on concrete slab measuring approximately 35m x 9m use for the exhibits of flora.
|
|
|
 |
|
Take 5
The Celebration Ground predominantly consists of grass turfed land covering half the area inscribed within a radius of 44metres. It is located next to Stage and Performance Area. |
|
|
 |
 |
|
Cabaran pendakian
In the shape of a crescent sloping and leading up to a performance stage which will be constructed of concrete structure with steel frames while the performance area will be covered by metal roofing. |
|
Singgah sebentar
Timber pavilions and benches located and scattered within the park will be provided for shelter and resting.
|
|
|
 |
Sembahyang asar di puncak ledang A water filled pond of 600 sq. m in dimension and 1,5m depth sits on natural earth with rubble pitching wall lining. Lily plants will be planted and left to grow in its natural environment. |
 |
 |
|
Kumpulan pendaki
menyambung pendakian
Adjoining to the wading pool, children's playground will generally be turfed and equipped with children's play stations of an appropriate design.
|
|
 |
|
Laluan curam
A 1000 square metres of generally grass turfed area with scattered picnic furnishing such as tables, benches and barbeque pits.Children's pool, approximately half of an Olympic size pool 0.45m in depth equipped with interactive water jets and play stations to cater for the children's entertainment.
|
|
|
Kaki puncak ledang
For the convenience of the public, changing room / rest room will be provided at an appropriate location.
|
|
|
 |
 |
|
Selamat tiba di
Puncak Ledang
A 1000 square metres of generally grass turfed area with scattered picnic furnishing such as tables, benches and barbeque pits.Children's pool, approximately half of an Olympic size pool 0.45m in depth equipped with interactive water jets and play stations to cater for the children's entertainment.

|
|
 |
|
Kabus pagi dan
laluan licin
A 1000 square metres of generally grass turfed area with scattered picnic furnishing such as tables, benches and barbeque pits.Children's pool, approximately half of an Olympic size pool 0.45m in depth equipped with interactive water jets and play stations to cater for the children's entertainment.
|
|
|
|
|
 |
Gua Kambing |
 |
Air Terjun |
Puncak Ledang Dan Menara Telekom
In the wake of future traffic growth, 1.9 km in length of Jalan Skudai fronting parcels E1 and E2 will be widened. The upgrading comes with the realignment and rerouting of existing drainage system, street lighting and relocation of utilities services.
|
|
|
 |
 |
|
Kabus Tebal
A 1000 square metres of generally grass turfed area with scattered picnic furnishing such as tables, benches and barbeque pits.Children's pool, approximately half of an Olympic size pool 0.45m in depth equipped with interactive water jets and play stations to cater for the children's entertainment.

|
|
|
|
|
|