SMK Seafield Through time SE : 1

 

Then...

In this photo , you can see the shot of the staircase at the east end of the school .  At first glance you'll notice that this picture shows the school under construction and the ground floor is muddy. The staircase isn't completed and the area is still hazardous as the railings aren't up , construction debris are everywhere and the building hasn't got it's window panes yet. 

 

Now...

 

Now , the once hazardous area of construction debris and mud has gone though a major transition with it's completed stairway leading up to the library , counseling room and classrooms. A rest area  , filled with an array of hanging orchids was constructed together with a few chairs for students to rest or have a little chat under the would be (in the future) foliage covered wooden roof.  A wide variety of vegetation was plated around the rest area and a stone foot path connects the three main blocks together.

 

Back to SMK Seafield through Time Next Picture

 

1