Resume

Charles Peterson
3100 S. Market Street
Redding, CA 96001

(530) 241-5754

March 1997- Hine Design, Sunnyvale, Ca.

April 1998 Title: Senior and Advance Mechanical Technician 

Job Duties: Problem resolving of complex assignments, and making recommendations, preparing technical reports and recommending solutions to technical problems, involved in design and development at the equipment. Building small robotic arms and other wafer handling units such as top loaders and 4.3 elevators wafer handling, clean room experience (100).
 

September 1996- Calspan/NASA, Mountain View, Ca

March 1997 Title: Electrician's Asst./Senior EM Technician 

Job Duties: Work closely with NASA engineers and scientists. Work closely with Senior Electricians on 6.9 breakers. Hard hat area. PLC ASSY -PCB installment, NASA certified in crimping and soldering, prepare documents for Supervisors, kept log of all work, PC and MAC. Lock and tag experience, familiar with all cables connectors, and crimping tools. Senior Mechanical Technician, (MCC) Motor Control Center, (MCE) Motor Control Evaluator Program
 

November 1995- Hine Design, Sunnyvale, Ca.

July 1996 Title: Senior and Advance Mechanical Technician 

Job Duties: Problem resolving of complex assignments, and making recommendations, preparing technical reports and recommending solutions to technical problems, involved in design and development at the equipment. Building small robotic arms and other wafer handling units such as top loaders and 4.3 elevators 
 

March 1995 - Stanford Linear Accelerator Center, Stanford, Ca.

November 1995 Title: Senior Insulation Technician 

Job Duties: Install and route high voltage cables, routing video cables, voice and data cables, underground routing, aerial routing (50+ feet), hard hat area. Use of all hand and power tools, crimping, etc., Installed bus bar, positive and negative cable, extreme high voltage, completed General Employee Radiological Training (GERT). 
 

January 1991 - Aerotek, Santa Clara, California

December 1994 Experienced voice and data wiring technician and puller. Certificate of Telecommunications. 
 

January 1988 - Assigned to Hewlett Packard, Palo Alto, Ca.

July 1988 Title: Computer Room Technician 

Job Duties: Working as an electrician, determining space requirements for up to 20 computer units and peripherals. Installing, troubleshooting and moving equipment. This includes pulling wires, verifying space requirements, determining switchbox loads. 
 

October 1987 - Assigned to TechniSkills at Stanford Linear Accelerator Center (SLAC), Stanford, Ca

January 1988. Title: Insulation Technician 

Job Duties: Electro/Mechanical technician, installing cables for communications to the Accelerator. Utilized the vacuum leak detector to determine Beam Line's integrity. Used precision mechanical tools (metric) to stabilize and align the BEAM LINE. 

DUE TO AN INHERITANCE, I TRAVELED EXTENSIVELY FOR TWO YEARS 
 

February 1986 - TechniSkills assigned to Singer/Link Division

April 1987 Title: Expediter 

Job Duties: Auditing and pulling up to thirty kits per day for large and small parts orders for flight simulators. Orders were documented and released in the computer. 
 

September 1985 - Stanford Linear Accelerator Center, Stanford, Ca.

January 1986 Title: Vacuum Technician 

Job Duties: Worked with precision parts for a vacuum chamber. 
 

July 1985 - National Semiconductor, Sunnyvale, Ca.

September 1985 Title: Sr. E/M Technician. 

Job Duties: Worked with microcomputers and disk drives. Built chassis for microcomputer and did wiring. 
 

April 1985 - TechniSkills assigned to Hewlett-Packard, Palo Alto, Ca.

October 1985 Title: Mechanical Technician 

Job Duties: Assembly of steel cabinets. Installed all hardware cable routing of Hewlett-Packard's GM 30 project. Cabinets weighed approximately 8,000 pounds. 
 

June 1984 - Ford Aerospace, Mountain View, Ca.

September 1984 Title: Sr. E/M Technician 

Job Duties: NASA Certified soldering and crimping complex coaxial cables and semi rigid cables. Put on Sam "T" project because of my overall experience with Government contract procedures, all work was done to military Standard. Point to point wiring and soldering, also worked on Mobile Unit installing up and down converters. Also installed interconnect panel and also auxiliary power units. Flat cable routing etc.. 
 

January 1984 - National Semi Conductor, Sunnyvale, Ca.

April 1984 Title: Mechanical Technician 

Job Duties: Scanner Production, built scanners with infrared laser, installed mirrors in scanner and aligned laser and balance. Installed all hardware and tested at company standard. Set up the scanner's for burn-in. Kept documented procedures, also worked on the Polygon Motor's. 
 

July 1983 - Spectra Physics, San Jose, Ca.

November 1983 Title: Sr. E/M Technician 

Job Duties: All work from prints, and ECO's. Complex Cable Harness, optic sensor assembly with point to point wiring and soldering. Mini angle motor assembly. Form Feed sensor Assembly. Airpax Motor Assembly, work from little or no supervision. Also involved in Transducer Assembly. 
 

April 1983 - Syva Corporation, Mountain View, Ca.

June 1983 Title: E/M Senior Assembler 
 

October 1982 - Livermore National Laboratory, Livermore, Ca.

March 1983 Title: E/M Technician 

Job Duties: (ATA) Advanced Test Accelerator. Rack wiring, Chassie wiring, Molex connectors, coaxial cables, rigid cables, advanced switch chassie's, scissor lifts, power supply (250,000 kw) wiring. Mechanical Technician, using all hand and power tools, chassie drilling equipment, all work done at military standard level, worked from Blueprints, ECO's, Schematics and wire lists.
 

http://www.geocities.com/pfcmartinez2003/contents.html

http://www.geocities.com/cpearl526/Pearl-Global-PGNI-526.html

 


 Charles Peterson Story

 Charles Peterson Facts by Tom Watson

 Three Strikes Legal - Index


1 1