This is our 21 foot 1978 Bayliner Cuddy Cabin Boat Project. Check back often to see out progress on it Last updated  26 APR 05
When we bought this boat it appeared all it needed was the floor replaced. The motor and out board was rebuilt not long ago. The boat came with all the material to finish the boat. all the wood, fiber glass and epoxy. all the seats and side panels have all been redone.
I started looking at it and the air cleaner was left off and it got some stuff down the intake so I pulled off the head and seen that I needed to have the head redone. Well a 150.00 later for the head work and another 100.00 for the Gasket set the head was ready to go back on. The cylinders all looked ok so Thank goodness I didn't need to pull the motor.
check out the next pages to see some pictures of what has been done so far. I will post more pictures as I go. Please be sure and sign my guest book. Thanks!!

Free counters provided by Andale.
Motor
Before Pictures
The back deck wood refinished
Shara and Paul Staining some wood
The new top for the boat
Sign Guestbook View Guestbook
I now have the floor fiber glassed in and I will be putting the carpet in here soon. check back often to see where I am at
1