![]() |
KISHORE ACHARYA
|
EDUCATION University of Kentucky , Lexington, KY, 40506 GPA 3.8 Construction Management, MS in Civil Engineering |
|
|
|
Eastern Kentucky University, Richmond, KY, 40475
GPA 3.8
Applied Computing, Master of Science , 2004 |
|
|
|
Institute of Engineering, Central Campus, Pulchowk,
Lalitpur, Nepal Civil Engineering, Bachelor’s (4 year's course), 1995 First Division |
|
|
|
Institute of Engineering, Central Campus, Pulchowk,
Lalitpur, Nepal Civil Engineering, Certificate Level (Equiv. 10+2), 1987 First Division |
|
|
|
COMPUTER SKILLS AND FAMILIARITY | |
|
|
Graduate Assistantship, Fall 2003, Microcomputer Lab and Teaching Assistant on Visual baisc
6.0 and Visual Basic
.Net, Department of Computer Science, Eastern Kentucky University, Richmond, KY 40475.
Graduate Assistantship, Spring 2002, Science Learning Resource Center, College of Arts
and Science,
Eastern Kentucky University, Richmond, KY 40475.
CO-OP JOB
Eastern Kentucky University, Facilities Services, Gentry Building,
Richmond, KY 40475.
OSRAM SYLVANIA, 435 East Washington Street, Winchester, KY 40391
PROFESSIONAL APPOINTMENTS
Eastern Kentucky University, Computer Science Department, Ricmond, KY 40475
Instructor, 2009
Taught Computer Literacy with Software Applications, which includes Microsoft Word, Excel, Access, PowerPoint, internet technology, windows operating system and some computer hardware and peripherals.
OSRAM SYLVANIA, 435 East Washington Street, Winchester, KY 40391
Computer Programming, 2004
Developed software including database design; used Visual Basic .Net to read different number of data files and store necessary data in SQL Server 2000
database. This database was used to fill necessary data in Excel file using visual basic application (VBA).
His Majesty’s Government of Nepal (HMG/N), Ministry of Water Resources (MOWR),
Department
of Irrigation (DOI), Sunsari Morang Irrigation Project, Biratnagar, Nepal
Engineer,
1999
Operation, Maintenance and Water Management of branch canals, construction of culverts,
graveling of service road, desilting of canal, canal lining, river Training, bridge construction,
construction of small intakes, repair of existing structures as required.
HMG/N, MOWR, DOI, Ground Water Irrigation Project, Chitwan, Nepal
Engineer
, 1998
Monitoring and evaluation of different Ground Water Irrigation subproject in Terai
Region of Nepal, maintenance of office buildings and staff quarters.
HMG/N, MOWR, DOI, East Rapti Irrigation Project, Chitwan, Nepal
Engineer
, 1998
Maintenance and rehabilitation of 34 farmers managed irrigation systems among 72
East Rapti Irrigation Project (ERIP) rehabilitated systems, design of small structures in canal,
supervision of construction work, conflict management (technical and social), motivate and assist
the water users association construction committee, preparation of project completion report.
HMG/N, MOWR, DOI, District Irrigation Office, Pyuthan, Nepal
Engineer, 1997
Planning, survey, design and rehabilitation work of farmers managed, irrigation system (Rani Kulo,
Bijuwar-Tari) with involvement of peoples’ participation; survey, design and construction of Gharikulo
Irrigation Subproject, Tikuri; survey, planning and hill track cutting along canal alignment and gabion
protection works of hill slope across the local drains and streams of Lungri Madi Irrigation Project;
planning, survey, design and river training works of small rivers; construction of office building and
staff quarter.
|
|
|
|