I've been pretty slow about getting pic's up, so you're not going to see the early steps at least for now.  But below is where we are as of September 23rd.  The roof should be finished by Friday, and the windows placed early next week. A lot of the windows are framed but not cut through yet.
This is the front (shows only the side we will be living in)
This shows both sides of the back from across the pond.  Our side is the left; we will be renting out the right side. Take to the next page, please!
1