13 Oct 2005
Went out late about 11
am... I only worked on creating a form for the northern door frame
foundation.

Below: Left picture, top
red line on right side, is the height of the floor... Red line left side
matches, the top of the plywood right picture below matches the level of the red
lines...
the top of the plywood
is the height of the top of the first layer of foam in the east wall. this is
the difference in height I have to meet to bring the floor level..

I will be filling in the
space with the white foam, this will not only help insulate but it will also
just fill in the space. Maybe one truck load of dirt will be enough to create my
dirt floor.
14 Oct 2005
I worked on smoothing
out the ditch beside the center wall and filled it with odd pieces of white
foam.