This is looking
at the load bearing wall and door that leads to the other half of
the basement.
The framed section in the upper right is the heat and air duct.
This
is the wall opposite of the previous picture. A nice 4x6 area that
would
accomodate an entertainment
center or a nice bar set-up.
Same spot after the primer has been applied. Notice the opening to
the right.
You'll see how
that is finished off later.
Obviously the walkout.
A drop ceiling has been installed and the duct has been enclosed.
The flooring has gone in and paint has been applied.
The lighting in
this photo does no justice what so ever!
Base molding and trim work has been installed. This by far was the
most tedious
of all. Since
nothing is ever perfect (or exactly square) I had to scribe, cut and
plane all the boards
used to frame out the window and door before the casing was
put on. All
the wood was unfinished. Staining and finishing is about as exciting
as
watching grass
grow.
The door has been put in. Try and find a pre-hung split jamb door
with a
6 inch jamb.
I ended up getting one for a 4 inch jamb and making the wide exposure
on this side off
the door.
Cathy
wanted a wide sill to set plants on. So there
it is. It's
12 inches wide. (that cats love it) I used
shelf brackets
as an accent.
Well that's all folks. Stay tuned for the "Living Room Project"