![]() |
Right wing is finally going back together. I used 1/2" plywood for first layer,then 3/4" foam and the top layer will be 1/4" plywood. I put two jack supports in, so I can install four jacks. |
![]() |
This is why the floor is going to be replaced after I get both wings finished. |
Instead of replacing the entire floor like Gene did, I opted to replace only the rotten area. You can see the sandwich construction in the floor. |
The bath area floor wasn't rotten but it was easier to remove and replace the whole back end. |
The driver side was really rotten. I've got the main part of the new floor in but haven't taken any pic's. |
Here are some pics of the floor and the wings. I used 3/4 inch PT plywood on the floor. I will use 2 inch plywood strips around the perimeter of my new piece of floor and some strips in the middle for strength. Then I will undercoat it all. |