Building Cisco Multi-layer Switching Networks
- Overall CLSC Course Objectives
- Introduction to Switching Concepts
- Virtual LANs
- Placing Catalyst 5000 Series Switches in Your Network
- Catalyst 5000 Series Switch
- Catalyst 5000 Series Switch Product Architecture
- Catalyst 5000 Series Switch Hardware
- Configuring Catalyst 5000 Series Switches
- Managing the Catalyst 5000 Series Switch Family
- Troubleshooting the Catalyst 5000 Series Switches
- Catalyst 5000 Series Switch FDDI Module
- Introduction to ATM LAN Emulation
- Catalyst 5000 Series Switch ATM LANE Module
- Configuring the Catalyst 5000 Series Switch ATM LANE Module
- Catalyst 1900 and Catalyst 2820 Hardware
- Catalyst 1900 and Catalyst 2820 Features
- Configuring Catalyst 1900 and Catalyst 2820 Switches
- Catalyst 3000 Series Switches
- Configuring the Catalyst 3000 Series Switches
- Maintaining the Catalyst 1900 and Catalyst 2820 Switches
- Troubleshooting the Catalyst 3000 Series Switches
The CLSC 1.0 (640-404) Features
- Computer based.
- ±70 questions.
- Multiple choices (Most choose more than one).
- Passing score 790 of 1000.
- 60 minutes.
Rules
- Cannot be reviewed or revisited.
- Non-adaptive.
- No Calculator.
- Recommended re-certification after 2 years.
Emphasized Subjects
- ATM concepts and terminology.
- Switching concept.
- Product features of all switches.
- Supervisor Engine.
- Catalyst 5000 architecture.
- LANE operation.
BETA BCMSN (3 hours 179 items)
- MLS.
- CGMP / IGMP.
- VTP.
- Trunking.
- ISL / IEEE802.1Q.
- No more 3000 serial switching, ATM & ASICs usage.
Note: Cisco LAN Switch Configuration (CLSC) is the old one.
|