Then.... | ![]() |
If you're standing on the bridge linking Block B and C and look towards the back portion of Block B during the school's construction period , you'll see the window frames being assembled , the walls revealing the bricks in them and construction debris on the ledge.
![]() |
Now.... |
Zoom towards the future and everything is now completed. The walls are covered with cement and paint to cover up the bricks inside. Window frames have been put in position with the windows panes in it's designated slot. Clear of debris , the ledge is now very clean and safe as nothing could rain down from them except rainwater.
The classrooms at the top floor are used by the form 5 in the morning and form 1 in the evening . Below the classrooms , resides the surau for muslim students . Another four classrooms is located in Block B , one next to the surau and the rest on the ground floor. All the classrooms have curtains on top of the windows. On the first floor , there is the examination room , HEM room and the SPBT room.