OBJECTIVE
Leadership position deploying web-based business solutions. Desired position would utilize both technical and business skillsets, and allow for creative input into the design process. Ideal position would encourage continued learning in both technical and business acumen. |
EXPERIENCE SUMMARY
11 years software industry experience designing and deploying business systems in Sales, Manufacturing, Order Management and Accounting. Proven experience in global implementations.
EXPERIENCE HISTORY Calico Commerce Inc., San Jose, CA June 1999 - Present Director, Knowledge & Education Services (Jul 2000 - present)Sun Microsystems Inc., Mountain View, CA Systems Conversion Manager (22 months) Sybase Inc., Emeryville, CA Accounts Receivable Implementation Manager (18 months) Managed design/build/test of all interfaces, modifications, reports and data conversions. Managed a 'big bang' cutover in 24 countries, each with local currency and reporting requirements, including European 'commissionaire' requirements. Successfully converted and reconciled $58.4m of Accounts Receivable data. Indonesian Aircraft Industries (IPTN), West Java, Indonesia MRPII Implementation Manager (34 months) Managed the implementations of the Design Engineering, Manufacturing Engineering and Shop Floor Control functions for a combined user community of approximately 300. Standardized part numbering schemes and order numbers from multiple sources. Led wholesale manual cleanup of parts that achieved over 99% bill of material accuracy. Converted Shop Floor systematically over a weekend with no interruption to production efforts. Designed and led local language MRP training to over 250 middle & senior managers. Designed and led local language 'hands-on training' to over 70 Engineering users. Managed process redesign and improvement in the Procurement, Shop Floor and Design Engineering functions. Achieved 30% reduction in Procurement lead time. Established 'root causes' for longest lead time issues in Shop Floor and Engineering. Helped the local workforce manage the implementation of the Bell Textron 412 helicopter, adding 30,000 parts and about 150 end users to the system in 4 months. Implemented Engineering BOMs, Manufacturing BOMs and Routings. Rocketdyne, Division of Rockwell, Canoga Park, CA Conversion & Interface Analyst/Software Developer (15 months) Developed and implemented interfaces, batch system support and production support for the Requisition and Purchase Order functions. Utilized specialized conversion tools to successfully convert purchase order and requistion data into the MRP II system. Baxter Travenol, Miami, FL May 1989 - August 1989 Manufacturing Operations Analyst Analyzed manufacturing operations, engineering, procurement and materials management resulting in one-time WIP savings of $1.96M and annual inventory holding cost savings of $450,000. Education B.S. Industrial Engineering, University of Miami, Florida, December 1989, Magna Cum Laude (3.78 GPA) |