INVESTIGATION OF PULSE COMBUSTION
Why investigation of pulse combustion?
The pulse combustor can be used to generate acoustic environment which
will reduce fouling of the heating surfaces inside of the large steam power
plant boilers, or to enhance heat and material transport in various applications
in process, agricultural and other industries.
Aim
Development of a gas-fired pulse burner which will be used as wave generator
in addition to existing burners in coal-fired large boilers.
Program of the investigation
The main part of the investigation will be done under real operation
conditions, according to the next program:
-
short repeat of the laboratory investigation (short checking of the previous
results),
-
proposal to the investigation under real operation conditions – program
of the investigation,
-
construction of the experimental line (to the real operation conditions),
-
choice and assembly of the measuring equipment,
-
experiment (2 years),
-
conclusion, final report
Total duration of the research program: 3 years
Equipment needs
-
Fast pressure transducers with appropriate adapter and cooling equipment
-
piezoelectric type KISTLER 10 pcs
-
capacitive type DISA 5 pcs 8.000,- DM
-
Charge Amplifier 6 pcs 4.000,- DM
-
Various thermocouples (including microthermocouples)
in total: 50 pcs 5.000,- DM
-
Flue gas analyzer (CO2, O2, CO, NOx,,
SOx) 25.000,- DM
-
Oscilloscope (Memoscope) 15.000,- DM
-
Equipment for the measuring of the characteristics of the generated acoustic
environment
-
microphone (various types) 6 pcs
-
digital frequency analyzer
-
amplifier
-
others 6.000,- DM
-
Automatic data acquisition equipment 12.000,- DM
-
Others, like flowmeters, manometers, cables etc.
-
Model of combustor 10.000,- DM
Personal
Bosnia Doc. Dr. I Smajevic, Dipl.-Ing.
Ass. Nihad Hodzic, Dipl.-Ing.
Three new persons
Knowledge and experience
Dr. Izet Smajevic has made his doctoral thesis (1991) in the field of
pulse combustion (under the leading of Prof. K. Hanjalic). The investigation
we proposed would be continuation of the previous done investigation.
Importance of the project
The results we will get are going to be applicable, especially in SPP
"Kakanj" near Sarajevo. It would be a new base for the continuation of
the narrow cooperation between the Faculty of the Mechanical Engineering
Sarajevo and Elektroprivreda BiH (SPP "Kakanj") we had before the war.
Possibly support to the investigation from the bosnian industry
We strongly hope that Elektroprivreda BiH is going to support the investigation,
at least by the manufacturing of some parts of the experimental equipment
(eg. some pieces of burners).
Doc. Dr. Izet Smajevic, Dipl.-Ing. |