IH-210 Project Manager responsible for the design of 3 miles of the light rail system including demolition plans, row, track profile and alignment, ballast, design of the Colorado Cut-and-cover underground box, ballast, light rail stations (Allen, Lake, Sierra Madre), the (230ft single span) Sierra Madre Villa pedestrian overpass, Sierra Madre Overpass Retrofit, coordination with the system’s control design, and coordination with several government entities such as the Metropolitan Transportation Authority (MTA), the Blue Line Construction Authority, CALTRANS, and the City of Pasadena.